What does a solar system cost in Serbia in 2026?

Our indicative price for a family house system is RSD 616,000 for 5 kWp to RSD 880,000 for 10 kWp, incl. installation, and it is the final price. Our solar calculator uses the same prices.

RSD 616,000 to RSD 880,000
for 5 to 10 kWp, final price
up to 50%
co-financing through a municipal public call
10.8 kW
for households, no building permit

Indicative prices, not an offer. Amounts are in dinars, converted at the NBS middle rate of 05/08/2026. They are final prices, Zansu d.o.o. is not registered for VAT. The exact price depends on your roof, the equipment and the grid connection.

Price examples 2026

Three typical systems

Indicative final prices, Zansu d.o.o. is not registered for VAT. We do not deduct any subsidy, because it depends on your municipality's call.

5 kWpSmaller house
Annual production, Belgrade
about 6,290 kWh
Indicative final priceRSD 616,000
8 kWpAverage household
Annual production, Belgrade
about 10,064 kWh
Indicative final priceRSD 775,000
10 kWpHigher consumption
Annual production, Belgrade
about 12,580 kWh
Indicative final priceRSD 880,000

Indicative prices for a system without battery, incl. installation, converted to dinars at the NBS middle rate of 05/08/2026. They are final prices, Zansu d.o.o. is not registered for VAT. Production is a PVGIS estimate for Belgrade, for a roof tilted 30° facing south (1,258 kWh per kWp per year). Prices are not an offer, the binding price is in your quote after a site visit.

What the price includes

Our systems are turnkey. You get a connected, running system, not an itemised list with surprises.

All prices are indicative and in dinars. They are final prices, Zansu d.o.o. is not registered for VAT. A battery is not included in the examples.

  • Site visit and proposalA check of your roof, wiring and electricity bill before the quote
  • Solar modulesNumber and output of modules sized to your roof and consumption, the exact model is in your quote
  • InverterHuawei or Sigenergy, sized to the system
  • Mounting system and installationSubstructure and installation on the roof by our team
  • Electrical installationConnection of the system to your house wiring
  • CommissioningConfiguration, testing and handover of the running system
  • Grid connection documentsWe prepare the documents for EDS and EPS and guide you to prosumer status
  • Production monitoringThe inverter maker's app, for example Huawei FusionSolar, for production and consumption
Optional: battery of 10 to 15 kWhabout + RSD 470,000 to RSD 822,000

What determines the price of your system

01Output in kWpThe biggest lever. More modules cost more, but the price per kWp drops with size.
02BatteryWith net metering a battery is not required. It raises self-consumption, and the price.
03ManufacturerHuawei or Sigenergy. Both are complete systems, the difference is in the equipment and the price per kWp.
04Roof shape and orientationFlat roof, pitched roof, tilt and shading determine how many modules fit and how much they deliver.
05AccessibilityRoof height, scaffolding needs and cable routes to the meter cabinet affect the installation effort.
Subsidies

The municipality awards the subsidy, not us

The Ministry of Mining and Energy and the municipalities co-finance solar panels on family houses through municipal public calls. The share is up to 50% for one measure and up to 65% for the advanced package of measures.

Each municipality publishes its call on its own schedule. The next national call has been announced for the last quarter of 2026.

Our prices never include a subsidy and we never deduct one in advance. The municipal committee decides who receives funds, under the rules of the call.

2025 callsMaximum for solar panels per household
One measure, up to 50%RSD 440,000
Advanced package, up to 65%RSD 572,000

Amounts from the Ministry of Mining and Energy annex linked on 19.11.2025 and from the GO Grocka call of 05.12.2025. New calls may set different amounts.

Ways to your own solar system

You buy the system and it is yours from day 1. A subsidy or a green loan can cover or spread part of the cost.

Solar Direct

Buy it, the system is yours

You pay for the system, and the solar power and the savings on your bill are yours.

  • Indicative price as above, which is the final price
  • Documents for EDS and EPS included
  • Net metering with the EDS request filed by 31.12.2026
See Solar Direct
Municipal subsidy

Up to 50% through a public call

When your municipality publishes a call, a subsidy can cover part of the investment.

  • You apply to the municipality, not to us
  • Family houses only
  • Quote from a contractor on the municipal list
How subsidies work
Green loan

A bank loan for energy efficiency

Banks in the GEFF programme offer loans for energy efficiency measures.

  • Erste, ProCredit, Intesa, 3Bank and NLB Komercijalna
  • You check rates and terms with the bank
  • You get our quote for the bank application
Ask us
Solar calculator

Your estimate in 2 minutes

Select your roof, enter your electricity bill, see the estimate. Free and without obligation.

Frequently asked questions

Questions about cost

Short answers, using the numbers on this page.

With us around RSD 616,000 for 5 kWp to RSD 880,000 for 10 kWp, incl. installation, without battery. That is the final price. The exact price is in your quote after a site visit.

If the municipality where your house is publishes a public call with a solar panel measure, you can apply. In the 2025 calls the share was up to 50% for one measure, capped at RSD 440,000. Apartments are generally not eligible.

The standard rate of 20%. Serbia has no reduced rate for solar equipment and installation. Zansu d.o.o. is not registered for VAT, so we charge no VAT on our prices. The prices you see are final.

A 10 to 15 kWh battery adds roughly RSD 470,000 to RSD 822,000. With net metering a battery is not required, so we recommend one when it makes sense for your consumption.

A system up to 10.8 kW for your own use needs no building authority act, even with a battery. From 10.8 to 150 kW a works approval decision is required.

That depends on your consumption, your tariff zone and the system size. It pays off fastest where it replaces expensive daytime electricity in the blue and red zones. The solar calculator works it out with your electricity bill and EPS tariffs.

Related topics

Subsidies in Serbia

How municipal public calls work and what they cover.

Payback

When your solar system pays for itself.

Battery storage

How a battery raises your self-consumption.