Buy a turnkey solar system and lower your electricity bill. You pay the final price, and the system is yours.
No registration required · No obligation

Indicative from RSD 616,000, final price (5 kWp, NBS rate)
Indicative from RSD 616,000, final price (5 kWp, NBS rate)
Net metering for households up to 10.8 kW
Net metering for households up to 10.8 kW
No building permit up to 10.8 kW
No building permit up to 10.8 kW
Swiss quality in equipment and installation
Swiss quality in equipment and installation
Indicative from RSD 616,000, final price (5 kWp, NBS rate)
Indicative from RSD 616,000, final price (5 kWp, NBS rate)
Net metering for households up to 10.8 kW
Net metering for households up to 10.8 kW
No building permit up to 10.8 kW
No building permit up to 10.8 kW
Swiss quality in equipment and installation
Swiss quality in equipment and installation
Sustainable energy, long-term cost savings and full transparency.

You buy the whole system at a final price.

We list the equipment warranty periods in your offer.

Surplus power reduces your consumption in the following months. For households that file the EDS request by 31.12.2026.

A Swiss company with Swiss installation standards.
A complete system for your roof, from design to commissioning.
Highly efficient solar modules for maximum energy generation, durable and resilient.

Keep solar power for the evening and use it when you need it. The battery is optional.

In Solar Direct

High output

Conversion

Live data

Turnkey

From the manufacturers

Optional
Households with systems up to 10.8 kW use net metering. Here is what it means for your bill.
The system produces while the sun shines. Electricity you use at that time does not come from the grid, so you do not pay for it.
Surplus you feed into the grid reduces your consumption in the following months, separately for the higher (VT) and lower (NT) tariff. Solar produces during the day, so it offsets higher-tariff consumption. Excise, VAT and levies apply to net consumption.
The settlement year runs from 1 April to 31 March. Surplus left on 31 March is cancelled without payment. That is why we size the system to your consumption.
Households that file the metering point adaptation request with EDS by 31 December 2026 keep net metering. New households move to net billing from 1 January 2027. Surplus is then settled in dinars at the price in the supplier contract, and that price is not regulated.
From offer to net metering. For systems up to 10.8 kW, EDS runs a simplified procedure with a legal maximum of 30 days.
Offer and contract
Installation
Request to EDS
Metering point adaptation
Contract with EPS
Offer and contract
Installation
Request to EDS
Metering point adaptation
Contract with EPS
We check your roof and consumption and prepare the design. The offer lists the equipment and the final price.
A licensed contractor installs the system and issues a statement that equipment and installation comply with regulations.
The metering point adaptation request is emailed to the regional EDS address, by you or by someone you authorise.
EDS removes the old meter. A licensed firm adapts the metering point, and EDS checks the work and seals it.
The request for a net metering contract goes to EPS at kp@eps.rs, with the EDS notice and the contractor's statement.
Once the contract is signed, the operator connects the system within 5 days and enters you in the prosumer register within the following 5 days. Until then, the system must not feed electricity into the grid.
Complete service for the safe and efficient operation of your solar system.

The offer states the warranty terms for panels, inverter and battery, exactly as in the manufacturers' documentation.

Professional installation to Swiss quality standards.

System monitoring and support during office hours.
Stay in control of consumption and costs, with an efficient, predictable energy system.
You do. You buy the complete system and it is your property. All savings on your electricity bill are yours.
No permit or act of a building authority is needed for a system up to 10.8 kW, including with a battery. A system from 10.8 kW to 150 kW needs a works approval (rešenje) under Article 145 of the Law on Planning and Construction.
A household prosumer can have a system of up to 10.8 kW. The system may never exceed the approved connection power.
Surplus electricity fed into the grid carries over from month to month and reduces your consumption, separately for the higher (VT) and lower (NT) tariff. Solar produces during the day, so it offsets higher-tariff consumption. Excise, VAT and levies apply to net consumption.
The settlement year runs from 1 April to 31 March. Surplus left on 31 March is cancelled without payment. That is why we size the system to your consumption, not to the size of your roof.
Households that file the metering point adaptation request with EDS by 31 December 2026 keep net metering. New households move to net billing from 1 January 2027. Surplus is then worth whatever the supplier contract says, because that price is not regulated.
The metering point adaptation request goes to the regional EDS. EDS removes the old meter, a licensed firm adapts the metering point, and EDS checks and seals it. The request for a net metering contract then goes to EPS. Systems up to 10.8 kW follow a simplified procedure with a legal maximum of 30 days.
You pay the final price. Zansu d.o.o. is not registered for VAT, so we charge no VAT. Several Serbian banks offer green loans for this kind of investment. Municipalities publish public calls for household subsidies from time to time. The amount depends on the call, so we never deduct it from the price.