Solar panel subsidies, Stari grad, Belgrade
The call "Javni poziv za sufinansiranje mera energetske sanacije porodičnih kuća i stanova na teritoriji Gradske opštine Stari grad" was published on 04/02/2026. The data below comes from the official source, checked on 11/09/2026.
Part of the national programme
The call is part of the programme of the Ministry of Mining and Energy and the World Bank. The municipality and the ministry fund it together, and the municipality publishes the call and selects contractors and recipients. The share is up to 50% for one measure and up to 65% for the advanced package of measures.
How subsidies work in SerbiaThe call at a glance
| Item | From the source |
|---|---|
| Published | 04/02/2026 |
| Applications from | 18/02/2026 |
| Application deadline | 23/03/2026 |
| Status | The deadline has passed. Stari grad publishes the next call on its website. |
| Total budget | RSD 14,250,000 |
| Solar panels | Yes |
| Maximum for solar panels | RSD 440,000 for one measure, RSD 572,000 in the advanced package |
| Maximum system output | 10.8 kW, and at most the approved connection power |
| Apartments, solar panels | No, family houses only |
| Heat pumps | Yes |
Who can apply for solar panels
Under this call only family houses can apply for solar panels, apartments cannot. The system output must not exceed the approved connection power on the electricity bill, and at most 10.8 kW.
What Free State does
We visit your house and propose a system within the limits of the call and your approved connection power.
We prepare the quote and technical data in the form the call requires.
We install the system and prepare the documents for EDS and EPS.
The quote in your application must come from a contractor on the list published by Stari grad. Before you apply, ask us whether we can be the contractor under this call.
After installation: prosumer status
A household system up to 10.8 kW needs no building permit. After installation, the metering point adaptation request goes to EDS, then the request for a net metering contract goes to EPS. Households that file the EDS request by 31/12/2026 keep net metering. New households from 01.01.2027 move to net billing.
Sources
- Gradska opština Stari grad, „Raspisan novi javni poziv za energetsku sanaciju porodičnih kuća i stanova“official source, published 04/02/2026
- Gradska opština Stari grad, tekst javnog poziva (PDF)official source, published 04/02/2026
Frequently asked questions
How much is the solar panel subsidy, Stari grad, Belgrade?
Under the call published on 04/02/2026, at most RSD 440,000 for one measure (up to 50% of the investment) and RSD 572,000 in the advanced package (up to 65%). A new call sets its own amounts.
Are applications still accepted?
Not under this call. The deadline of the call published on 04/02/2026 has passed. Stari grad publishes the next call on its website.
Can I apply for solar panels if I live in an apartment?
No. Under this call solar panels are a measure for family houses only.
Calculate a system for your house
The calculator works without any subsidy, so you know what the system costs even if you receive no funds from a call.