Solar panel subsidies, Novi Sad
The call "Javni poziv za sufinansiranje mera energetske sanacije porodičnih kuća i stanova na teritoriji Grada Novog Sada" was announced for 12/12/2025. The data below comes from the official announcement, checked on 11/09/2026.
Part of the national programme
The call is part of the programme of the Ministry of Mining and Energy and the World Bank. The municipality and the ministry fund it together, and the municipality publishes the call and selects contractors and recipients. The share is up to 50% for one measure and up to 65% for the advanced package of measures.
How subsidies work in SerbiaThe call at a glance
| Item | From the source |
|---|---|
| Publication, as announced | 12/12/2025 |
| Applications from | 22/12/2025 |
| Application deadline | Not stated in the source we read |
| Status | Check the official website to see whether applications are still accepted. |
| Total budget | RSD 46,000,000 (RSD 27,600,000 ministry, RSD 18,400,000 city) |
| Solar panels | Yes |
| Maximum for solar panels | Not stated in the source we read |
| Maximum system output | Not stated in the source we read |
| Apartments, solar panels | Not stated in the source we read |
| Heat pumps | Not stated in the source we read |
Who can apply for solar panels
The source we read does not say who can apply for solar panels. In other calls under the same programme this measure applied to family houses only, up to 10.8 kW. Check the exact conditions in the call text.
What Free State does
We visit your house and propose a system within the limits of the call and your approved connection power.
We prepare the quote and technical data in the form the call requires.
We install the system and prepare the documents for EDS and EPS.
The quote in your application must come from a contractor on the list published by Novi Sad. Before you apply, ask us whether we can be the contractor under this call.
After installation: prosumer status
A household system up to 10.8 kW needs no building permit. After installation, the metering point adaptation request goes to EDS, then the request for a net metering contract goes to EPS. Households that file the EDS request by 31/12/2026 keep net metering. New households from 01.01.2027 move to net billing.
Sources
- Grad Novi Sad, „Od 12. decembra počinje novi ciklus podrške za energetsku sanaciju domaćinstava“official source, published 01/12/2025
Frequently asked questions
How much is the solar panel subsidy, Novi Sad?
The source we read does not state an amount for solar panels. The call text sets the amount.
Are applications still accepted?
The source we read does not state a deadline. Check the official website to see whether applications are still accepted.
Can I apply for solar panels if I live in an apartment?
The source we read does not say. In other calls under the same programme, solar panels were a measure for family houses only.
Calculate a system for your house
The calculator works without any subsidy, so you know what the system costs even if you receive no funds from a call.
Open the calculatorLast checked 11/09/2026