Solar panel subsidies, Grocka, Belgrade

The call "Javni poziv za sufinansiranje mera energetske sanacije porodičnih kuća i stanova na teritoriji gradske opštine Grocka za 2025. godinu" was published on 05/12/2025. The data below comes from the official source, checked on 11/09/2026.

Part of the national programme

The call is part of the programme of the Ministry of Mining and Energy and the World Bank. The municipality and the ministry fund it together, and the municipality publishes the call and selects contractors and recipients. The share is up to 50% for one measure and up to 65% for the advanced package of measures.

How subsidies work in Serbia

The call at a glance

ItemFrom the source
Published05/12/2025
Application deadline45th day after publication or until the funds run out
StatusThe deadline has passed. Grocka publishes the next call on its website.
Total budgetRSD 23,500,000
Solar panelsYes
Maximum for solar panelsRSD 440,000 for one measure, RSD 572,000 in the advanced package
Maximum system output10.8 kW, and at most the approved connection power
Apartments, solar panelsNo, family houses only
Heat pumpsYes

Who can apply for solar panels

Under this call only family houses can apply for solar panels, apartments cannot. The system output must not exceed the approved connection power on the electricity bill, and at most 10.8 kW.

What Free State does

  • We visit your house and propose a system within the limits of the call and your approved connection power.

  • We prepare the quote and technical data in the form the call requires.

  • We install the system and prepare the documents for EDS and EPS.

The quote in your application must come from a contractor on the list published by Grocka. Before you apply, ask us whether we can be the contractor under this call.

After installation: prosumer status

A household system up to 10.8 kW needs no building permit. After installation, the metering point adaptation request goes to EDS, then the request for a net metering contract goes to EPS. Households that file the EDS request by 31/12/2026 keep net metering. New households from 01.01.2027 move to net billing.

Sources

Frequently asked questions

How much is the solar panel subsidy, Grocka, Belgrade?

Under the call published on 05/12/2025, at most RSD 440,000 for one measure (up to 50% of the investment) and RSD 572,000 in the advanced package (up to 65%). A new call sets its own amounts.

Are applications still accepted?

Not under this call. The deadline of the call published on 05/12/2025 has passed. Grocka publishes the next call on its website.

Can I apply for solar panels if I live in an apartment?

No. Under this call solar panels are a measure for family houses only.